Renovating an older home can be incredibly rewarding, but it also comes with challenges you simply can’t always see at the beginning.

That was definitely the case with Reno on Abeona.

Once demolition started, we discovered sections of the existing stonework were far less stable than expected, with parts of the old stone beginning to fall away from the walls. Before we could move forward, we needed to carefully repair, patch and strengthen those areas to make sure the existing structure was sound.

The tiling brought its own level of complexity too.

The owners had selected beautiful small-format Japanese porcelain tiles, and because of the way they were made, there were slight variations in size from tile to tile. Only small differences, but enough to make laying them neatly and consistently a real challenge.

Our tiler worked incredibly carefully and patiently to achieve a beautiful finish, taking the time to balance the variation and keep the overall layout looking clean and precise.

Partway through the project, we unexpectedly lost our tiler due to personal circumstances, so we had to quickly find someone else who was available and capable of taking over the work.

Fortunately, we found another exceptional local tiler who stepped in and completed the remaining work to the same high standard.

Then came another challenge.

The home already had beautiful timber floorboards that the owners wanted to protect throughout the renovation, so we carefully covered them before work began. When it came time to remove the protective covering, we discovered that part of the top coating had lifted from some of the boards.

The owners had a small amount of spare flooring stored in the garage, but understandably wanted to keep it as backup if possible. We searched everywhere for matching replacement boards, only to find that the original flooring had been discontinued.

So we worked through the options together.

In the end, we agreed to use some of the spare boards and brought in a local floor layer to help us carefully replace the affected sections. With only a limited amount available, every board mattered and we needed to minimise waste wherever possible.

And somehow, we managed it - with a full box still left in storage at the end. 🙌

Another challenge worked through, another problem solved.

For us, that’s such a big part of renovation work. You can plan carefully, but older homes and detailed finishes will sometimes present things you couldn’t have known or predicted at the beginning.

What matters is how those moments are handled - staying calm, finding a practical solution, communicating openly, working with good trades and looking after the parts of the home that matter to the owners.

Existing spaces. New possibilities. And a few unexpected challenges along the way. 🤍

- CCBUILD

In their words…

Dave and his team of contractors were efficient and so easy to communicate with. Easy to have within our home and extremely responsive to anything we wanted to discuss.  Dave and Billy particularly are professional, clean and just lovely guys to have within your home during a time of messiness and uncertainty.  Dave managed anything complex that came up in our old home and found solutions to sometimes tough situations.  He’s so calm and solution orientated allowing our aspirations for the home to be achieved.  We love so many aspects of our home but the indoor outdoor section of our home is our favourite allowing us to enjoy the open space and entertain our family and friends no matter the weather.  We love the finishes in our home including the doors, handles and drop zone.  He’s helped modernise our home balancing the old with new.  Thanks so much Libby and Dave.”

- Tammy and Liam